Explanation
Total work = LCM of the days
Take total work as the LCM of the days. A in ten days, B in fifteen: thirty units of work.
Total work = LCM of the days
A = 30 ÷ 10 = 3 units/day · B = 2 units/day
A does thirty over ten: three units a day. B does two.
A = 30 ÷ 10 = 3 units/day · B = 2 units/day
Together 5 units/day
Together they do five units a day. Thirty over five: six days.
Together 5 units/day → 30 ÷ 5 = 6 days
Pipes
Pipes are the same idea. A filling pipe adds, a leak subtracts.
Fill in twelve, empty in eighteen: total thirty-six; plus three, minus two: one unit an hour, thirty-six hours.
Pipes: filling +, emptying −; fill 12 h, empty 18 h → +3 − 2 = 1/h → 36 h
M₁D₁ = M₂D₂ (men × days constant)
With more people, fewer days. Men times days stays constant.
Twelve men take eighteen days; nine men take twenty-four.
M₁D₁ = M₂D₂ (men × days constant)
Worked example
A and B together finish a job in 12 days; A alone in 20. Total = 60.
A + B = 5/day, A = 3/day → B = 2/day → B alone 30 days.